Skip to main content
Marwood General Construction
Menu
  • About
  • Services
    • Estimating
    • Commercial
    • Residential
    • General Construction
    • Trucking & Hauling
  • Federal
  • State
  • Portfolio
  • Careers
  • facebook linkedin instagram
  • Contact Us
Marwood General Construction
Press enter to begin your search
Close Search

Home » Green Cove Creek Fish Barrier Removal

20240731_105339
20240731_105853
20240812_122005
20240807_145450
20240807_145453
20240830_072739
20240830_074936
20240821_072916
20240821_153940
20240823_075333
20240913_140303
20240904_112429
20240906_111504
20240907_132917
20240911_072315
20240830_132112

Year: 2024

Scope: Remove a 50-foot-tall road embankment and build a new 150-foot-long post-tensioned bridge over Green Cove Creek.

The bridge will replace a 5-foot-wide culvert that partially collapsed.

Site development work included roadway excavation, channel excavation, streambed restoration, and temporary bypass.

Project Milestones:

  • Clearing and grading of almost 1 acre of land
  • Export of over 20,000 cubic yards of spoils
  • Installation of Streambed including streambed cobbles, boulders, riprap, and logs
  • Installation of over 500ft of temporary waterline and gate valve
  • Installation of erosion controls including straw wattles, and quarry spalls

 

  • Next ProjectSR 167, I-5 to SR509- New Expressway Project

Share Tweet Share Pin
Marwood Logo Light
(360) 328-3322 Message Us

Marwood General Construction
18887 WA 305 NE
Suite 800
Poulsbo WA 98370

(360) 328-3322
office@marwoodgc.com

© 2025 Marwood General Construction. Website designed by Integrity Marketing. Privacy Policy.

  • facebook
  • linkedin
  • instagram
Close Menu
  • About
  • Services
    • Estimating
    • Commercial
    • Residential
    • General Construction
    • Trucking & Hauling
  • Federal
  • State
  • Portfolio
  • Careers
  • Contact Us
  • facebook
  • linkedin
  • instagram